My First Tower!
By Scott Neader, KA9FOX
ka9fox@QTH.com
That's my house to the right... and our property line ends where that white fence starts on the left.
The Trylon specs call for a base of about 5.5' by 5.5' wide and 6ft deep, with a 'bell' at the bottom about 7.5ft wide, and they call for 7.0 cubic yards of concrete! (much more on that later).
PHOTO 7: The digging!
I was lucky enough to have a friend of mine dig the hole with a small backhoe, and I paid an outfit $50 to haul the dirt out of the backyard.